P
PNewitt
Guest
As I've been getting copies of the Marti reports with GT/CS Registrations, I am noticing most cars "actually built "X" days after (or before) the production date stamped on the door tag.
I've been told that when they would build the Mustangs at the San Jose plant, that there would be a "GT/CS Assembly Day" at the factory about once a week or so. Seeing these Marti Reports makes me wonder if this was true.
I'm wondering if they would group cars by the CS option (??), regardless of the date the frame (unibody) was bucked. As if the CS option changed the actual production date.
This is something I bet Kevin Marti would know...with just a few keystrokes. (???)
Paul N.
p.s. thanks to everyone who has sent in registrations! (and the very cool photos (some on CD, too--which makes it easier for me!))
I've been told that when they would build the Mustangs at the San Jose plant, that there would be a "GT/CS Assembly Day" at the factory about once a week or so. Seeing these Marti Reports makes me wonder if this was true.
I'm wondering if they would group cars by the CS option (??), regardless of the date the frame (unibody) was bucked. As if the CS option changed the actual production date.
This is something I bet Kevin Marti would know...with just a few keystrokes. (???)
Paul N.
p.s. thanks to everyone who has sent in registrations! (and the very cool photos (some on CD, too--which makes it easier for me!))