case12
Well-known member
Recently Roland (karolscali) contacted me showing from his Marti report that his CS was built the same day as mine. Since both of our cars are fairly early, I checked into some of the details to see what we could learn about how the CS's were built on the line, and what ways they were ordered. Attached are the two reports side by side. Notice the following things:
1. Roland's was ordered 1/30. Mine has no order date.
2. Both were sent to Pasadena.
3. The VIN are about 600 cars separated. Feb was still a ramp up month. Scheduled build day is one day apart. Buck day, serial day, and build day are exactly the same.This would confirm to me that these cars were built on the line (or pulled off), but not built in batches (thoughts?).
4. Roland's is ordered as "Stock" and highly optioned. Mine is "Basic Off-Standard" with few options. Again, on the same day two very different CS's were built - making me think they were built on the line (thoughts?).
6. Sell dates - Roland's sold 4/8. Mine sold 8/18.
I just wanted to share this to possibly shed some light on how our GT/CS's were built. Any other observations? Any thoughts? Casey
1. Roland's was ordered 1/30. Mine has no order date.
2. Both were sent to Pasadena.
3. The VIN are about 600 cars separated. Feb was still a ramp up month. Scheduled build day is one day apart. Buck day, serial day, and build day are exactly the same.This would confirm to me that these cars were built on the line (or pulled off), but not built in batches (thoughts?).
4. Roland's is ordered as "Stock" and highly optioned. Mine is "Basic Off-Standard" with few options. Again, on the same day two very different CS's were built - making me think they were built on the line (thoughts?).
6. Sell dates - Roland's sold 4/8. Mine sold 8/18.
I just wanted to share this to possibly shed some light on how our GT/CS's were built. Any other observations? Any thoughts? Casey